|
City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
|---|---|---|---|---|---|---|---|
|
Plainfield,
IN Hendricks United States |
Smith Rd. / Marjorie Ln. / Anthem Ave. (39.72418, -86.36142) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0037 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | Year Completed estimated (2023-2024). |
|
Avon,
IN Hendricks United States |
S Dan Jones Rd. / Oriole Way (E CR 150 S) (39.74099, -86.38104) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2024-2025). |
|
West Lafayette,
IN Tippecanoe United States |
Morehouse Rd. / CR W 350 N / (parking) (40.46779, -86.93881) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2024 | https://www.wlfi.com/news/local/work-on-roundabout-to-close-intersection-of-morehouse-kalberer-roads/article_38b31edc-0181-11ef-981c-cba4b0ad3794.html. |
|
Auburn,
CA Placer United States |
SR 49-SR 193 (El Dorado St.) / Borland Ave. / Lincoln Way (38.90401, -121.06566) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.facebook.com/auburnjournal/videos/the-roundabout-has-opened-at-hwy49lincoln-and-borland-a-few-hours-earlier-than-s/1562674994918591/ |
|
Overland Park,
KS Johnson United States |
W 167th St. / US 69 NB Ramps (38.82554, -94.67600) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2026 | Raindrop shaped. https://www.opkansas.org/newsroom/69express-167th-street-at-u-s-69-to-close-for-180-days-beginning-april-6/ |
|
Overland Park,
KS Johnson United States |
W 167th St. / Antioch Rd. (38.82547, -94.68630) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Right-turn-only lanes on north and east legs. Multilane pedestrian crossings on east, north, and west legs. https://johnsoncountypost.com/2023/08/24/overland-park-167th-street-project-219788/ |
|
Walnut Cove,
NC Stokes United States |
US 311 (S Main St.) / E 1st St. / Old Depot Rd. (36.29271, -80.14129) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | |
|
Puslinch,
ON Wellington Canada |
Wellington 34 Rd. / Concession Rd. 7 (43.46083, -80.17118) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 46.0000 |
Other (At-Grade) Single-Lane |
2024 | |
|
Cambridge,
ON Waterloo Canada |
Fountain St. N / Maple Grove Rd. (43.42431, -80.37856) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 72.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2025 | Yield-controlled right-turn bypass lane on west and south legs. https://www.regionofwaterloo.ca/en/living-here/fountain-street.aspx. |
|
Alpharetta,
GA Fulton United States |
Webb Bridge Rd. / Webb Bridge Way (34.06479, -84.22650) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | |
|
Tacoma,
WA Pierce United States |
S 21st St. / S M St. (47.24140, -122.45225) |
Traffic Calming Circle Existing |
Uncontrolled None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
|
Tacoma,
WA Pierce United States |
S 21st St. / S Sheridan Ave. (47.24126, -122.45369) |
Traffic Calming Circle Existing |
Uncontrolled None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
|
Tacoma,
WA Pierce United States |
S 21st St. / S Cushman Ave. (47.24111, -122.45511) |
Traffic Calming Circle Existing |
Uncontrolled None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
|
Naugatuck,
CT Naugatuck Valley United States |
Rte 63 (Meadow St. / Cherry St.) / Rubber Ave. (41.48679, -73.05789) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | |
|
Overland Park,
KS Johnson United States |
W 167th St. / US 69 SB Ramps (38.82560, -94.67763) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2026 | Raindrop shaped. https://www.opkansas.org/newsroom/69express-167th-street-at-u-s-69-to-close-for-180-days-beginning-april-6/ |
|
Edwards,
CO Eagle United States |
US 6 / Arrowhead Dr. (39.63866, -106.56468) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2025 | Year Completed estimated (2023-2025). |
|
Vail,
CO Eagle United States |
S Frontage Rd. W / (parking) (39.64450, -106.38174) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
2 Approaches 1 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | |
|
Sarasota,
FL Sarasota United States |
Palmer Blvd. / Apex Rd. (27.32581, -82.44348) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2026 | https://www.facebook.com/SRQCountyGov/posts/exciting-news-the-newly-completed-roundabout-at-apex-road-and-palmer-blvd-is-now/1319708003524990/ |
|
Ave Maria,
FL Collier United States |
Ave Maria Blvd. / Milano St. / Massa Way (26.33069, -81.43904) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2007 | Year Completed estimated (2006-2007). Truck apron added 2017-2021. |
|
Linden,
CA San Joaquin United States |
E Comstack Rd. / N Duncan Rd. (38.04484, -121.09613) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2024 | Rural with high-speed approaches. |
|
Woodbridge,
CA San Joaquin United States |
Chestnut St. / E Woodbridge Rd. / Mokelumne St. (38.15576, -121.30644) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 22.8600 |
Other (At-Grade) Single-Lane |
2003 | Pedestrian crossing on north leg at driveway. |
|
Ridgeville,
SC Berkeley United States |
SC 27 (Ridgeville Rd.) / I-26 EB Ramps (33.13642, -80.31112) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2026 | Will be multilane when complete. https://www.counton2.com/news/local-news/berkeley-county-news/roundabouts-replacing-traditional-ramps-at-i%e2%80%9126-exit-in-berkeley-county/. https://www.i26-sc27.com/pdfs/PH_11-7-2019/I-26%20and%20SC%2027%20Roundabout%20Movements.pdf. |
|
Ridgeville,
SC Berkeley United States |
SC 27 (Ridgeville Rd.) / I-26 WB Ramps (33.13795, -80.30982) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2026 | Will be multilane when complete. https://www.counton2.com/news/local-news/berkeley-county-news/roundabouts-replacing-traditional-ramps-at-i%e2%80%9126-exit-in-berkeley-county/. https://www.i26-sc27.com/pdfs/PH_11-7-2019/I-26%20and%20SC%2027%20Roundabout%20Movements.pdf. |
|
Boiling Springs,
SC Spartanburg United States |
Belcher Rd. / Old John Dodd Rd. / River Forest Dr. (35.01291, -82.01292) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2025 | https://www.facebook.com/SpartanburgCountyGovernment/posts/safety-spotlight-spartanburg-county-is-committed-to-reducing-fatal-and-serious-i/1297816875727171/. |
|
Atlanta,
GA Fulton United States |
Wieuca Rd. NE / Phipps Blvd. NE / Park Ave. NE (33.85570, -84.36110) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2026 | www.buckheadcid.com/projects/wieuca-road-phipps-boulevard-roundabout/. |
|
Richland,
WA Benton United States |
Swift Blvd. / Wright Ave. (46.27898, -119.29767) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 19.8120 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2025 | |
|
Dock Junction,
GA Glynn United States |
Glynco Pkwy. / Harry Driggers Blvd. / Canal Rd. (31.24593, -81.48790) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | https://www.glynncounty.org/news/traffic-shift-begins-friday-september-19-canal-road-roundabout. |
|
Canton,
GA Cherokee United States |
Technology Ridge Pkwy. / Fate Connector Rd. / Heard Rd. (34.28908, -84.45418) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
|
Canton,
GA Cherokee United States |
Bluffs Pkwy. / Technology Ridge Pkwy. (34.28916, -84.46303) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | |
|
St George,
UT Washington United States |
W Canyon Tree Dr. / W Firepit Knoll Dr. (37.19211, -113.61059) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2021-2023). |
|
St George,
UT Washington United States |
S Ledges Pkwy. / W Conder Bluffs Pkwy. / N Movie Rock Dr. (37.18983, -113.61887) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2019 | South leg stubbed. Year Completed estimated (2017-2020). |
|
St George,
UT Washington United States |
W Canyon Tree Dr. / N Arcadian Shores Dr. (37.19441, -113.61980) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
St George,
UT Washington United States |
S Hidden Valley Dr. / S Hidden Valley Dr. (west) (37.05409, -113.56883) |
Other Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands on two legs. | |
|
St George,
UT Washington United States |
S Hidden Valley Dr. / S Hidden Valley Dr. (east) (37.05369, -113.56714) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands on two legs. | |
|
Versailles,
MO Morgan United States |
MO 5 / MO 52 (W Newton St.) / W Newton St. (38.43175, -92.85144) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2026 | https://www.modot.org/node/78271. Year Completed estimated (2025-2026). |
|
Ka'u,
HI Hawaii United States |
Crater Rim Dr. / (park entrance) (19.42857, -155.25542) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | Intersection shifted approximately 230 ft to the west. https://www.instagram.com/reel/DMYfSCiBK5k/. |
|
Charlotte,
NC Mecklenburg United States |
IBM Dr. / University Pointe Blvd. (35.30251, -80.76690) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2017 | Year Completed estimated (2016-2018). |
|
Fairview,
NC Union United States |
SR 218 / Sikes Mill Rd. (35.13054, -80.47905) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/UnionCountyNC/posts/-attn-fairviewunionville-residents-good-news-weve-received-word-from-the-north-c/907177064786783/. |
|
Stallings,
NC Union United States |
Stallings Rd. / Healing Way / (parking) (35.09629, -80.67776) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 57.9120 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
|
Charlotte,
NC Mecklenburg United States |
Bryant Farms Rd. / Elm Ln. / Blakeney Heath Rd. (35.04725, -80.81579) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | Left-turn-only lane on west leg. Right-turn-only lane on north leg. https://www.charlottenc.gov/Growth-and-Development/Projects/Bryant-Farms. |
|
Indian Land,
SC Lancaster United States |
Parkway Dr. / Prayer Center Dr. / Crossridge Blvd. (34.96245, -80.85236) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2022 | |
|
Durham,
NC Durham United States |
Fendol Farm Pkwy. / Bowhall Dr. / Atlas Dr. (35.94810, -78.78555) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2023 | Curbing completed 2021. Markings added 2023-2024. |
|
Walker,
MI Kent United States |
Center Dr. NW / Weatherford Dr. NW (43.02096, -85.68611) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2024 | https://www.wzzm13.com/article/traffic/new-roundabout-opens-walker/69-f660176a-6a57-4a45-8ac5-7dea143a9bdb. |
|
Grand Rapids,
MI Kent United States |
Hastings St. NE / Sinclair Ave. NE (42.97219, -85.65833) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2021 | Compact roundabout; east leg is inbound traffic only. Year Completed estimated (2020-2021). |
|
Toledo,
OH Lucas United States |
N Summit St. / Shoreland Ave. (41.72660, -83.47957) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2025 | https://www.facebook.com/lucascountyengineer/videos/the-wait-is-over-summit-st-and-shoreland-ave-roundabout-is-now-open/785629650585355/. |
|
(unincorporated),
NC Beaufort United States |
US 264 / SR 32 (35.52855, -76.94924) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | Right-turn-only lane on west and east US 264 legs. Add-lane right-turn bypass lane on northeast SR 32 leg. |
|
Rocky Face,
GA Whitfield United States |
Mount Vernon Rd. / Houston Valley Rd. (34.80479, -85.05486) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.facebook.com/WhitfieldCountyGA/posts/mt-vernonhouston-valley-roundabout-is-now-openhere-are-a-few-quick-reminders-for/1187183273234601/. |
|
Oxford,
NC Granville United States |
Williamsboro St / Gilliam St / New College St (36.31248, -78.58715) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2024 | Elliptical shaped. ICD = 110 ft x 90 ft. Painted splitter islands on north and south legs. |
|
Bellingham,
WA Whatcom United States |
E Bakerview Rd. / James St. (48.78944, -122.46415) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2025 | External truck aprons on west and east entries. https://cob.org/project/james-bakerview-intersection-es-473. |
|
Smoke Rise,
AL Blount United States |
I-65 SB Ramps / US 31-SR 160 / Lester Doss Rd. (33.84779, -86.82844) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 57.9120 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2025 | Merging right-turn bypass lane on west leg. Left-turn-only lane on east leg. |
|
Smoke Rise,
AL Blount United States |
I-65 NB Ramps / US 31-SR 160 / White Oak Trl. (33.84839, -86.82625) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 56.3880 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2025 | Right-turn-only lane on north, west, and south legs. Left-turn-only lane on east leg. |
|
Henderson,
KY Henderson United States |
US 60 / I-69 NB Ramps (37.86335, -87.52481) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2025 | Raindrop shaped. https://www.facebook.com/I69ORX/posts/the-new-us-60-interchange-is-complete-the-new-roadway-ky-3690-connects-the-new-u/1432749818853593 |
|
Henderson,
KY Henderson United States |
US 60 / Tillman Bethel Rd. / (unknown) (37.86323, -87.52307) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | https://www.facebook.com/photo/?fbid=1541550624640178&set=what-a-difference-on-this-throwbackthursday-check-out-the-new-interchange-at-us- |
|
Eveleth,
MN St Louis United States |
US 53 / Progress Pkwy. / Park Ave. (47.47789, -92.53028) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | https://www.wdio.com/front-page/top-stories/roundabout-by-rock-ridge-to-open-wednesday/ |
|
De Soto,
KS Johnson United States |
W 103rd St. / Edgerton Rd. (38.94248, -95.01939) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 64.0080 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | Merging right-turn bypass lane on east leg. https://www.ksdot.gov/projects/project-archive/de-soto-local-road-improvements-project/de-soto-local-road-improvements-construction-progress. |
|
De Soto,
KS Johnson United States |
W 103rd St. / Evening Star Rd. (38.94249, -95.03785) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 65.5320 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | https://www.ksdot.gov/projects/project-archive/de-soto-local-road-improvements-project/de-soto-local-road-improvements-construction-progress |
|
(unincorporated),
NS Antigonish Canada |
Beaver Meadow Rd. / Hwy 104 EB Ramps (45.56658, -62.12791) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://hwy104twinning.ca/progress-history/. |
|
(unincorporated),
NS Antigonish Canada |
Beaver Meadow Rd / Hwy 104 WB Ramps (45.56820, -62.12917) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://hwy104twinning.ca/progress-history/. |
|
(unincorporated),
NS Pictou Canada |
Hwy 4 / Hwy 104 WB Ramps (45.58834, -62.28660) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 58.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
|
(unincorporated),
NS Pictou Canada |
Hwy 4 / Hwy 104 EB ramps (45.58647, -62.28680) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 58.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
|
Kelowna,
BC Central Okanagan Canada |
Chute Lake Rd. / Frost Rd. / Chute Lake Crescent (49.80204, -119.49790) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2025 | |
|
Lake Stevens,
WA Snohomish United States |
Soper Hill Rd. / 87th Ave. NE (48.02157, -122.11388) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2023 | |
|
Newark,
OH Licking United States |
Thornwood Dr. SE / River Rd. / Reddington Rd. (40.04684, -82.47926) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | https://www.youtube.com/watch?v=IUh8YH9JRks |
|
Wooster,
OH Wayne United States |
Oak Hill Rd. / Oldman Rd. / Oak Hill Park (40.83591, -81.95331) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2023 | |
|
Wooster,
OH Wayne United States |
W Milltown Rd. / Oak Hill Rd. (40.84316, -81.95374) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/100064785036215/posts/91024milltown-oak-hill-roundabout-progress-pic-is-taken-from-the-inner-circle-pa/918819843620842/ |
|
Wooster,
OH Wayne United States |
SR 585 (Akron Rd.) / N Geyers Chapel Rd. (40.83869, -81.89711) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 149.9997 |
Other (At-Grade) Single-Lane |
2025 | Elliptical shaped. ICD = 150 ft x 120 ft. |
|
Wooster,
OH Wayne United States |
N Honeytown Rd. / Smithville Western Rd. / E Smithville Western Rd. (40.85791, -81.87800) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2025 | https://www.the-daily-record.com/story/news/traffic/2025/09/05/smithville-western-and-honeytown-roundabout-opens-in-wayne-county-ohio-smithville/85892312007/. |
|
Loveland,
CO Larimer United States |
E 37th St. / Madison Ave. / Seeley Dr. (40.43013, -105.05838) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Single-Lane |
2025 | https://www.facebook.com/CityofLovelandCO/videos/loveland-the-madison-avenue-corridor-improvement-project-has-just-completed-a-hu/1490668942036026/. |
|
Moncks Corner,
SC Berkeley United States |
Cypress Forest Dr. / Shadewood Way (33.11233, -80.07085) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2007 | |
|
Goose Creek,
SC Berkeley United States |
Coleridge Dr. / Helena Park Dr. (33.06705, -80.10768) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
|
Barboursville,
VA Orange United States |
US 33 / SR 20 (38.17105, -78.27937) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2026 | https://www.vdot.virginia.gov/projects/culpeper-district/roundabout-at-us-33-and-route-20/. |
|
Bryan,
TX Brazos United States |
Groesbeck St. / Palasota Dr. (30.65901, -96.37882) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2022 | |
|
Bloomington,
IN Monroe United States |
W Gordon Pike / Batchelor School Dr. / S Clear View Dr. (39.12180, -86.54406) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | https://www.wbiw.com/2025/07/21/fullerton-pike-west-gordon-connector-nearing-completion-in-monroe-county-faces-unexpected-rock-removal-costs/. |
|
Dover,
WI Racine United States |
STH 75 (N Beaumont Ave. / S Beaumont Ave.) / CR A (Plank Rd.) (42.72749, -88.11090) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | Rural. |
|
Lacey,
WA Thurston United States |
Mullen Rd. SE / Marvin Rd. SE (47.00341, -122.75439) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2026 | |
|
Reeds Spring,
MO Stone United States |
US 160-SR 13 / US 160 / SR 13-SR 248 / Dogwood Tree Rd. (36.76744, -93.34991) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.modot.org/projects/missouri-route-13-us-route-160-and-missouri-route-248-roundabout-construction-stone-county. |
|
El Reno,
OK Canadian United States |
US 81 (I-40 Business) / US 66 / S Shepard Ave. (35.50804, -97.93713) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 56.3880 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2025 | https://www.facebook.com/yukonprogressnews/posts/the-roundabout-project-is-the-first-for-el-reno-and-city-of-el-reno-field-servic/1261026562692059/. |
|
Columbus,
GA Muscogee United States |
Williams Rd. / Fortson Rd. (32.56447, -84.94914) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2025 | |
|
Sandusky,
OH Erie United States |
US 6 (Cleveland Rd.) / Cedar Point Dr. (41.44171, -82.68090) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2026 | https://www.youtube.com/watch?v=Gzwc-YtKP9Y. |
|
Rancho Cordova,
CA Sacramento United States |
Baroque Dr. / Kilgore Rd. (38.58103, -121.27048) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Single-Lane |
2025 | |
|
Santonito,
NM Bernalillo United States |
SR 14 / Frost Rd. / Sandia Crest Rd. (35.16301, -106.34909) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2025 | Year Completed estimated (2024-2025). |
|
Aldie,
VA Loudoun United States |
US 50 (Little River Turnpike) / Trailhead Dr. / Lenah Farm Ln. (38.95305, -77.57992) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | Turbo roundabout. Raised lane dividers on north half to separate westbound left and through movements. Merging right-turn bypass lane on south leg. https://www.loudoun.gov/5455/Route-50-and-Trailhead-Drive-Roundabout. |
|
Rockford,
IL Winnebago United States |
Airport Dr. / Kishwaukee St. (42.21241, -89.08691) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2015-2017). |
|
Rockford,
IL Winnebago United States |
Whitman St. / Ridge Ave. (42.28140, -89.09069) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2025 | Dotted edge lines across exits. https://www.youtube.com/watch?v=kN2sA29fZJA |
|
Hayden,
AL Blount United States |
US 31-SR 160 / SR 3 (33.84870, -86.82499) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | Replaced stop-and-yield-controlled triangle of intersections. |
|
Columbia,
MO Boone United States |
CR K / W Old Plank Rd. / S Maple Meadows Dr. (38.87579, -92.36500) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2026 | |
|
Conway,
AR Faulkner United States |
US 64-SR 287 / Hogan Ln. (35.11177, -92.49970) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2026 | https://www.instagram.com/p/DXrEd6-j-LX/ |
|
Denham Springs,
LA Livingston United States |
Juban Rd. / (unknown) (30.47877, -90.91839) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2026 | |
|
Denham Springs,
LA Livingston United States |
US 190 (Florida Blvd.) / Juban Rd. (30.48285, -90.91747) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2026 | Add-lane right-turn bypass lane on west leg. Yield-controlled right-turn bypass lane on south leg. |
|
Lawrence,
NJ Mercer United States |
US 206 / Princeton Ave. (40.24568, -74.74660) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Single-Lane |
2025 | https://www.mercercounty.org/departments/planning/transportation-projects/bce-. |
|
Wilmington,
DE New Castle United States |
Avenue North Blvd. / Astrazeneca Dr. (39.78685, -75.54781) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2026 | |
|
Wilmington,
DE New Castle United States |
Crawford Circle: MacDonough Rd. / Blackshire Rd. (39.75515, -75.57416) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
Wilmington,
DE New Castle United States |
Barley Mill Plaza / Buckley Mill Plaza / Buckley Mill Building (39.75916, -75.60027) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
Pedestrian crossings adjacent to circulatory roadway. | |
|
New Castle,
DE New Castle United States |
Chaddwyck Blvd. / Heddington Rd. (39.63635, -75.62563) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 21.3357 |
Other (At-Grade) Single-Lane |
2014 | Year Completed estimated (2011-2016). |
|
New Castle,
DE New Castle United States |
Phoebe Farms Ln. / Elizabeth Sweetbriar Ln. (39.63445, -75.62139) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 20.7264 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
New Castle,
DE New Castle United States |
Keller Beyer Rd. / Elizabeth Sweetbriar Ln. (39.63510, -75.62092) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 20.7264 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
New Castle,
DE New Castle United States |
Florence Fields Ln. / Elizabeth Sweetbriar Ln. (39.63623, -75.62007) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 20.7264 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
Bear,
DE New Castle United States |
Rose Hill Dr. / Whirlaway Dr. / Talamore Ct. (39.57352, -75.76032) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 19.8120 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
Painted splitter islands. | |
|
Middletown,
DE New Castle United States |
Sugar Maple Blvd. / Scarlet Oak St. / Northern Oak St. (39.47828, -75.63981) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
No splitter islands on west, south, or east legs. | |
|
Smyrna,
DE Kent United States |
Canwit Dr. / Jimmy Dr. (39.28159, -75.59444) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2009 | Year Completed estimated (2007-2009). |