|
City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
|---|---|---|---|---|---|---|---|
|
(unincorporated),
TX Fort Bend United States |
Sienna Lakes / Park Crossing (29.48508, -95.48447) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Other (At-Grade) Single-Lane |
2026 | |
|
Laramie,
WY Albany Co. United States |
N 15th St. / E Willett Dr. (41.31329, -105.57715) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2025 | West leg closed with construction of roundabout. |
|
Lafayette,
IN Tippecanoe Co. United States |
Cardinal Dr. / Wharfside Pkwy. (40.34570, -86.92134) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2005 | Year Completed estimated (2004-2005). |
|
Concord,
NC Cabarrus Co. United States |
Christenbury Pkwy. / Herrons Nest Pl. NW (35.37989, -80.73738) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | |
|
Lake Delton,
WI Sauk Co. United States |
S Burritt Ave. / Xanadu Rd. (43.58591, -89.79787) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 24.3840 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2023 | |
|
Brookhaven,
GA DeKalb Co. United States |
Colonial Dr. NE / Oglethorpe Ave. NE (33.85413, -84.34290) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 2 Driveways 19.8120 |
Other (At-Grade) Single-Lane |
2018 | |
|
St John’s,
Newfoundland and Labrador Division 1 Canada |
Danny Dr. / Hwy 1 (Trans-Canada Hwy.) WB Ramps (47.49599, -52.86529) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2024 | https://www.saltwire.com/atlantic-canada/galway-getting-better-connected-to-trans-canada-highway-in-103-million-interchange-development-100804980 |
|
(unincorporated),
AL Madison Co. United States |
Pettus Rd. / Pine Grove Rd. (34.79385, -86.74032) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.facebook.com/fox54newshuntsville/videos/-round-and-round-the-newest-roundabout-in-madison-county-is-open-for-traffic-at-/818002001016288/ |
|
Asheboro,
NC Randolph Co. United States |
US 220 Business S / Pisgah Covered Bridge Rd. (35.63500, -79.82666) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2025 | Year Completed estimated (2024-2025). https://www.youtube.com/watch?v=4NZQlWJI-OU |
|
Johns Island,
SC Charleston Co. United States |
River Rd. / (school access) (32.76392, -80.06217) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2025 | https://www.facebook.com/CityCharleston/posts/-heads-up-johns-island-drivers-with-the-new-school-year-starting-a-new-roundabou/1173393141491577/. |
|
Columbus,
OH Franklin Co. United States |
SR 3 (Westerville Rd.) / Westerville Woods Dr. (40.06690, -82.93152) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.youtube.com/watch?v=W1c1GklJlv0. |
|
Oak Bluffs,
MA Dukes Co. United States |
Sea View Avenue Extension / Circuit Ave. (41.45981, -70.55751) |
Other Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Single-Lane |
2024 | Parking in circulatory roadway. https://vineyardgazette.com/news/2024/03/21/north-bluff-roundabout-nears-completion. |
|
Dubuque,
IA Dubuque Co. United States |
N English Rd. / US 52 WB Ramps (42.46796, -90.73783) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | |
|
Dubuque,
IA Dubuque Co. United States |
N English Rd. / US 52 EB Ramps (42.46615, -90.73887) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Single-Lane |
2020 | |
|
Lilburn,
GA Gwinnett Co. United States |
Jennifer Dr. / Hood Rd. / Lilburn School Rd. (33.89002, -84.14934) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2025 | https://www.11alive.com/article/news/local/new-hood-road-roundabout-part-of-safer-redesign-in-lilburn/85-563dd6d2-7de3-43c7-9f8f-a056a21c9e37. |
|
Hawks Prairie,
WA Thurston Co. United States |
Hawks Prairie Rd. NE / Johnson Point Rd. NE / South Bay Rd. NE (47.09072, -122.82287) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.thurstoncountywa.gov/news/new-roundabout-hawks-prairie-eases-congestion. |
|
North Kingstown,
RI Washington Co. United States |
Rte 1A (Phillips St. / Boston Neck Rd.) / Brown St. (41.56865, -71.45284) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2025 | Boston Neck Road previously had yield sign. Phillips Road previously had stop sign. https://www.facebook.com/groups/OurNK/posts/4339207022975190/ |
|
Bodø,
Nordland Bodø Norway |
Hålogalandsgata / Fridtjof Nansens vei (67.27729, 14.38179) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 32.0000 |
Other (At-Grade) Single-Lane |
||
|
Happy Valley,
OR Clackamas Co. United States |
SE King Rd. / SE 129th Ave. (45.44693, -122.53086) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2024 | https://www.happyvalleyor.gov/129th-roundabout/ |
|
Newberg,
OR Yamhill Co. United States |
E Mountainview Dr. / N Villa Rd. (45.31753, -122.96386) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2025 | https://newsberg.org/2025/11/11/how-to-use-a-roundabout-or-traffic-circle/ |
|
Langford,
BC Capital Canada |
Peatt Rd. / Hockley Ave. (48.44774, -123.50174) |
Roundabout Existing |
All-Way Yield Active Pedestrian Warning (flashing yellow) |
3 Approaches 0 Driveways 26.0000 |
Other (At-Grade) Single-Lane |
2024 | https://langford.ca/advisories/traffic-intersection-of-peatt-road-and-hockley-avenue/. |
|
Mocksville,
NC Davie Co. United States |
US 158 / Farmington Rd. (35.95224, -80.52935) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | https://www.daviecountync.gov/CivicAlerts.aspx?AID=1468&ARC=2156 |
|
Farmington,
NC Davie Co. United States |
Farmington Rd. / I-40 WB Ramps (35.95766, -80.53279) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.ncdot.gov/news/press-releases/Pages/2023/2023-08-02-davie-county-roundabout.aspx |
|
Nydalen,
Trøndelag Trondheim Norway |
Byåsveien / Bøckmans veg (63.39807, 10.35741) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
St George,
UT Washington Co. United States |
(unknown) / (unknown) (37.15784, -113.63522) |
Other Existing |
Unknown Unknown |
3 Approaches 3 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
St George,
UT Washington Co. United States |
(unknown) / (unknown) (37.16004, -113.63406) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
St George,
UT Washington Co. United States |
(unknown) / (unknown) (37.15987, -113.63701) |
Other Existing |
Unknown Unknown |
3 Approaches 3 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
St George,
UT Washington Co. United States |
(unknown) / (unknown) (37.16154, -113.63937) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
St George,
UT Washington Co. United States |
(unknown) / (unknown) (37.16473, -113.63751) |
Other Existing |
Unknown Unknown |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
St George,
UT Washington Co. United States |
Cohonina Cir. / N Cohonina Trl. / W Supai Trl. (37.14773, -113.63518) |
Other Existing |
Unknown Unknown |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
St George,
UT Washington Co. United States |
W Entrada Trl. / W Entrada Trl. (37.15539, -113.63050) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
St George,
UT Washington Co. United States |
W Entrada Trl. / Private St. (37.15396, -113.63095) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
St George,
UT Washington Co. United States |
W 1400 N / W 1400 N (37.13303, -113.60848) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands on two legs. | |
|
Red Bluff,
CA Tehama Co. United States |
S Main St. / I-5 NB Ramps (40.15465, -122.22167) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2024 | |
|
Park City,
UT Summit Co. United States |
Silver Summit Pkwy. / US 40-US 189 EB Ramps (40.71680, -111.48807) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 76.2000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2024 | https://www.parkrecord.com/2024/06/17/construction-begins-on-roundabout-at-silver-summit-interchange/. |
|
Culpeper,
VA Culpeper Co. United States |
US 15-US 522-SR 3 (Germanna Hwy.) / McDevitt Dr. (38.45546, -77.98781) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.vdot.virginia.gov/news-events/news/culpeper-district/mcdevitt-dr-and-new-roundabout-opened-to-traffic.php. |
|
Mesa,
AZ Maricopa Co. United States |
E Cadence Pkwy. / E Twinkle Ave. (33.31028, -111.62183) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways 67.0557 |
Other (At-Grade) Single-Lane |
2019 | |
|
Leesville,
LA Vernon Par. United States |
US 171 (S 5th St.) / Boone St. (31.12009, -93.26935) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | https://wwwapps.dotd.la.gov/administration/announcements/announcement.aspx?key=40073#gsc.tab=0. |
|
Ewing,
NJ Mercer Co. United States |
Silvia St. / Town Centre Blvd. E (40.26177, -74.80654) |
Other Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2021 | Lane change required to exit to southeast leg. |
|
Grayson,
GA Gwinnett Co. United States |
Lakeview Rd. / Hillside Dr. / Pharrs Rd. (33.88541, -83.99625) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.gwinnettcounty.com/-/gwinnett-county-board-of-commissioners-roundup-4 |
|
Medora,
ND Billings Co. United States |
Pacific Ave. (I-94 Business) / Chateau Rd. (46.91706, -103.53308) |
Roundabout Existing |
All-Way Yield At-grade Rail Crossing Signals/Gates (controlling approach only) |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | Railroad crossing approximately 140 ft to southwest. https://www.dot.nd.gov/news/medora-roundabout-open-traffic-pattern-place-winter |
|
Vineland,
NJ Cumberland Co. United States |
(unknown) / (parking) (39.44277, -75.05621) |
Other Existing |
Other Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Yield on circulatory roadway. | |
|
Cherry Hill,
NJ Camden Co. United States |
Garden Park Blvd. / Crescent Way (39.93034, -75.03535) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2006 | Year Completed estimated (2005-2006). |
|
Voorhees,
NJ Camden Co. United States |
(unknown) / (unknown) (39.86695, -74.94734) |
Other Existing |
Uncontrolled Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
|
West Paterson,
NJ Passaic United States |
Mica Dr. / Rock Hill Ave. (40.87586, -74.18906) |
Other Existing |
All-Way Stop Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
|
Montclair,
NJ Essex United States |
Church St. / Valley Rd. (40.81500, -74.22145) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Single-Lane |
2020 | Converted from old traffic circle in 2020. |
|
Berkeley Springs,
WV Morgan United States |
US 522 (Valley Rd.) / Berkeley Springs Bypass (39.59477, -78.24465) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 70.1040 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | Right-turn-only lane on south and east legs. Left-turn-only lane on north leg. Exit to bypass closed until the bypass is complete (planned for 2027). |
|
Oxford,
MS Lafayette United States |
SR 314 (University Ave.) / SR 7 SB Ramps (34.36224, -89.50696) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 48.7680 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2025 | https://www.facebook.com/MississippiDOT/posts/good-things-are-coming-around-like-the-new-roundabouts-were-constructing-at-high/1281014930723219/ |
|
Oxford,
MS Lafayette United States |
SR 314 (University Ave.) / SR 7 NB Ramps (34.36192, -89.50492) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 51.8160 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2025 | Raindrop shaped. https://www.facebook.com/MississippiDOT/posts/good-things-are-coming-around-like-the-new-roundabouts-were-constructing-at-high/1281014930723219/. |
|
White Lake,
MI Oakland United States |
Elizabeth Lake Rd. / Town Center Blvd. (42.64556, -83.50134) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4317 |
Other (At-Grade) Single-Lane |
2024 | Part of White Lakes Township plan to make this area a city center. |
|
Hayden,
ID Kootenai United States |
W Lancaster Rd. / N Ramsey Rd. (47.78803, -116.80123) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2025 | |
|
Arlington,
VA Arlington United States |
Military Rd. / Nelly Custis Dr. (38.90409, -77.10821) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | Oblong shaped. ICD = 85 ft x 65 ft. Originally built as a temporary in 2021, but upgraded to mini-roundabout between October 2022 and May 2023. According to the linked article, it's going to be upgraded to full roundabout by 2027. https://www.arlnow.com/2025/09/23/construction-on-long-promised-roundabout-on-military-road-gets-underway/. |
|
Cochrane,
AB Division 6 Canada |
Hwy 1A / Hwy 22 SB Ramps (51.19964, -114.48889) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 60.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2025 | |
|
Cochrane,
AB Division 6 Canada |
Hwy 1A / Hwy 22 NB Ramps (51.19744, -114.48419) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 64.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2025 | Elliptical shaped. ICD = 64 m x 53 m. |
|
Cochrane,
AB Division 6 Canada |
Glenpatrick Dr. / Glenhill Dr. (51.18947, -114.48341) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
2025 | https://cochranenow.com/articles/key-glenpatrick-road-work-finished-just-in-time. |
|
Woodbridge,
CA San Joaquin United States |
Chestnut St. / E Woodbridge Rd. / Mokelumne St. (38.15576, -121.30644) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 22.8600 |
Other (At-Grade) Single-Lane |
2003 | Pedestrian crossing on north leg at driveway. |
|
Ridgeville,
SC Berkeley United States |
SC 27 (Ridgeville Rd.) / I-26 EB Ramps (33.13642, -80.31112) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2026 | Will be multilane when complete. https://www.counton2.com/news/local-news/berkeley-county-news/roundabouts-replacing-traditional-ramps-at-i%e2%80%9126-exit-in-berkeley-county/. https://www.i26-sc27.com/pdfs/PH_11-7-2019/I-26%20and%20SC%2027%20Roundabout%20Movements.pdf. |
|
Ridgeville,
SC Berkeley United States |
SC 27 (Ridgeville Rd.) / I-26 WB Ramps (33.13795, -80.30982) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, unspecified) |
2026 | Will be multilane when complete. https://www.counton2.com/news/local-news/berkeley-county-news/roundabouts-replacing-traditional-ramps-at-i%e2%80%9126-exit-in-berkeley-county/. https://www.i26-sc27.com/pdfs/PH_11-7-2019/I-26%20and%20SC%2027%20Roundabout%20Movements.pdf. |
|
Overland Park,
KS Johnson United States |
W 167th St. / US 69 SB Ramps (38.82560, -94.67763) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2026 | Raindrop shaped. https://www.opkansas.org/newsroom/69express-167th-street-at-u-s-69-to-close-for-180-days-beginning-april-6/ |
|
Edwards,
CO Eagle United States |
US 6 / Arrowhead Dr. (39.63866, -106.56468) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 44.1960 |
Other (At-Grade) Single-Lane |
2025 | Year Completed estimated (2023-2025). |
|
Alpharetta,
GA Fulton United States |
Webb Bridge Rd. / Webb Bridge Way (34.06479, -84.22650) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | |
|
Avon,
IN Hendricks United States |
S Dan Jones Rd. / Oriole Way (E CR 150 S) (39.74099, -86.38104) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2024-2025). |
|
Lebanon,
IN Boone United States |
N 150 W (Witt Rd.) / W 325 N (40.08710, -86.49675) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | Double left turn on south leg. INDOT Contract R-44240; INDOT Project DES 2300284. |
|
Townsville,
Queensland Townsville Australia |
Burdell Dr. / Swain Way (-19.25749, 146.70427) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways |
Other (At-Grade) Single-Lane |
||
|
Norwood Young America,
MN Carver United States |
STH 5-STH 25 / CR 33 (44.77639, -93.92940) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Single-Lane |
2021 | Intersection moved about 250 feet north. https://westernbuilder.news/WB/article/EB48D01C-minnesota-dot-carver-county-norwood-young-america-announce-completion-of-hwy-212. |
|
Huxley,
IA Story United States |
US 69 / Anthem Dr. (41.88330, -93.60058) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2025 | |
|
Modesto,
CA Stanislaus United States |
Vintage Dr. / Landmark Cir. (37.69282, -121.05360) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 22.2501 |
Other (At-Grade) Single-Lane |
2019 | |
|
(unincorporated),
NS Antigonish Canada |
Beaver Meadow Rd. / Hwy 104 EB Ramps (45.56658, -62.12791) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://hwy104twinning.ca/progress-history/. |
|
(unincorporated),
NS Antigonish Canada |
Beaver Meadow Rd / Hwy 104 WB Ramps (45.56820, -62.12917) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 55.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2022 | https://hwy104twinning.ca/progress-history/. |
|
(unincorporated),
NS Pictou Canada |
Hwy 4 / Hwy 104 WB Ramps (45.58834, -62.28660) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 58.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
|
(unincorporated),
NS Pictou Canada |
Hwy 4 / Hwy 104 EB ramps (45.58647, -62.28680) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 58.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2021 | |
|
De Soto,
KS Johnson United States |
W 103rd St. / Edgerton Rd. (38.94248, -95.01939) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 64.0080 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | Merging right-turn bypass lane on east leg. https://www.ksdot.gov/projects/project-archive/de-soto-local-road-improvements-project/de-soto-local-road-improvements-construction-progress. |
|
Henderson,
KY Henderson United States |
US 60 / I-69 NB Ramps (37.86335, -87.52481) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 54.8640 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2025 | Raindrop shaped. https://www.facebook.com/I69ORX/posts/the-new-us-60-interchange-is-complete-the-new-roadway-ky-3690-connects-the-new-u/1432749818853593 |
|
Smoke Rise,
AL Blount United States |
I-65 SB Ramps / US 31-SR 160 / Lester Doss Rd. (33.84779, -86.82844) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 57.9120 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2025 | Merging right-turn bypass lane on west leg. Left-turn-only lane on east leg. |
|
Ka'u,
HI Hawaii United States |
Crater Rim Dr. / (park entrance) (19.42857, -155.25542) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | Intersection shifted approximately 230 ft to the west. https://www.instagram.com/reel/DMYfSCiBK5k/. |
|
Overland Park,
KS Johnson United States |
W 167th St. / US 69 NB Ramps (38.82554, -94.67600) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2026 | Raindrop shaped. https://www.opkansas.org/newsroom/69express-167th-street-at-u-s-69-to-close-for-180-days-beginning-april-6/ |
|
Durham,
NC Durham United States |
Fendol Farm Pkwy. / Bowhall Dr. / Atlas Dr. (35.94810, -78.78555) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2023 | Curbing completed 2021. Markings added 2023-2024. |
|
Walker,
MI Kent United States |
Center Dr. NW / Weatherford Dr. NW (43.02096, -85.68611) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Single-Lane |
2024 | https://www.wzzm13.com/article/traffic/new-roundabout-opens-walker/69-f660176a-6a57-4a45-8ac5-7dea143a9bdb. |
|
Grand Rapids,
MI Kent United States |
Hastings St. NE / Sinclair Ave. NE (42.97219, -85.65833) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2021 | Compact roundabout; east leg is inbound traffic only. Year Completed estimated (2020-2021). |
|
St George,
UT Washington United States |
S Hidden Valley Dr. / S Hidden Valley Dr. (west) (37.05409, -113.56883) |
Other Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands on two legs. | |
|
Canton,
GA Cherokee United States |
Technology Ridge Pkwy. / Fate Connector Rd. / Heard Rd. (34.28908, -84.45418) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | |
|
Canton,
GA Cherokee United States |
Bluffs Pkwy. / Technology Ridge Pkwy. (34.28916, -84.46303) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | |
|
Lawrence,
NJ Mercer United States |
US 206 / Princeton Ave. (40.24568, -74.74660) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 53.3400 |
Other (At-Grade) Single-Lane |
2025 | https://www.mercercounty.org/departments/planning/transportation-projects/bce-. |
|
Conway,
AR Faulkner United States |
US 64-SR 287 / Hogan Ln. (35.11177, -92.49970) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Single-Lane |
2026 | https://www.instagram.com/p/DXrEd6-j-LX/ |
|
Rockford,
IL Winnebago United States |
Airport Dr. / Kishwaukee St. (42.21241, -89.08691) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2015 | Year Completed estimated (2015-2017). |
|
Rockford,
IL Winnebago United States |
Whitman St. / Ridge Ave. (42.28140, -89.09069) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2025 | Dotted edge lines across exits. https://www.youtube.com/watch?v=kN2sA29fZJA |
|
Hayden,
AL Blount United States |
US 31-SR 160 / SR 3 (33.84870, -86.82499) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | Replaced stop-and-yield-controlled triangle of intersections. |
|
Carmel Valley,
CA Monterey United States |
W Carmel Valley Rd. / Laureles Grade Rd. (36.50097, -121.75644) |
Roundabout Unknown |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2026 | Temporary traffic signals during construction. https://www.montereycountynow.com/blogs/news_blog/carmel-valley-road-drivers-will-face-delays-from-roundabout-construction-and-road-repairs/article_7a3d9407-c1a3-46d0-bf70-89060fe8cff0.html. https://www.facebook.com/MontereyCoInfo/posts/the-traffic-signals-at-the-carmel-valley-rd-laureles-grade-intersection-will-be-/1385466166958490/. |
|
Sandusky,
OH Erie United States |
US 6 (Cleveland Rd.) / Cedar Point Dr. (41.44171, -82.68090) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2026 | https://www.youtube.com/watch?v=Gzwc-YtKP9Y. |
|
Rancho Cordova,
CA Sacramento United States |
Baroque Dr. / Kilgore Rd. (38.58103, -121.27048) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Single-Lane |
2025 | |
|
Lacey,
WA Thurston United States |
Mullen Rd. SE / Marvin Rd. SE (47.00341, -122.75439) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2026 | |
|
Goose Creek,
SC Berkeley United States |
Coleridge Dr. / Helena Park Dr. (33.06705, -80.10768) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2023 | Year Completed estimated (2022-2023). |
|
Barboursville,
VA Orange United States |
US 33 / SR 20 (38.17105, -78.27937) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2026 | https://www.vdot.virginia.gov/projects/culpeper-district/roundabout-at-us-33-and-route-20/. |
|
Wooster,
OH Wayne United States |
W Milltown Rd. / Oak Hill Rd. (40.84316, -81.95374) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | https://www.facebook.com/100064785036215/posts/91024milltown-oak-hill-roundabout-progress-pic-is-taken-from-the-inner-circle-pa/918819843620842/ |
|
Lake Stevens,
WA Snohomish United States |
Soper Hill Rd. / 87th Ave. NE (48.02157, -122.11388) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 24.3840 |
Other (At-Grade) Single-Lane |
2023 | |
|
Kirkland,
WA King United States |
NE 85th St. / I-405 SB Ramps (47.67918, -122.18535) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x2 max) |
2026 | Raindrop shaped. https://www.kirklandwa.gov/Whats-Happening/News/Meet-the-Oblong-Roundabout-at-the-I-405-NE-85th-Street-Interchange. |
|
Kirkland,
WA King United States |
NE 85th St. / I-405 NB Ramps (47.67924, -122.18375) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2026 | Raindrop shaped. https://www.kirklandwa.gov/Whats-Happening/News/Meet-the-Oblong-Roundabout-at-the-I-405-NE-85th-Street-Interchange. |
|
Raleigh,
NC Wake United States |
Blue Ridge Rd. S / Homewood Banks Dr. (35.83318, -78.68028) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 1 Driveways 33.5280 |
Other (At-Grade) Single-Lane |
2026 | https://www.instagram.com/p/DVqqgyCDhNY/. |
|
Danbury,
OH Ottawa United States |
SR 269 / S Danbury Rd. (41.50567, -82.82985) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2026 | https://www.thebeacon.net/its-open/. |
|
Ocean View,
DE Sussex United States |
Old Mill Way / Old Mill Way (38.55903, -75.08412) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |