|
City,
State County Country |
Intersection (Lat, Lng) |
Type Status |
Control Type / Other Control Type | Approaches / Driveways / ICD (m) |
Functional Class / LaneType |
Year Completed | Comments |
|---|---|---|---|---|---|---|---|
|
North Port,
FL Sarasota Co. United States |
US 41 (S Tamiami Trl.) / Wellen Park Blvd. (27.04947, -82.32793) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 51.8160 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | https://westvillagesid.org/us41improvementproject/ |
|
Greenwich,
CT Western Connecticut United States |
Davis Ave. / Indian Harbor Dr. (41.02167, -73.61854) |
Other Existing |
Other Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Circulatory roadway yields to entering vehicles. | |
|
Old Greenwich,
CT Western Connecticut United States |
Riverside Ave. / Summit Rd. / Arch St. / W End Ave. (41.03157, -73.57292) |
Other Existing |
Other Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. Mix of stop and yield control on entry. | |
|
Coventry,
RI Kent Co. United States |
Dante Blvd. / Stephanie Dr. (41.66939, -71.56437) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2007 | |
|
Coventry,
RI Kent Co. United States |
Dante Blvd. / Angelina Dr. (41.66726, -71.56369) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2008 | |
|
Coventry,
RI Kent Co. United States |
Dante Blvd. / Greig Ct. (41.66517, -71.56454) |
Other Existing |
Uncontrolled Unknown |
3 Approaches 1 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2010 | |
|
Warwick,
RI Kent Co. United States |
Community College of Rhode Island Access Rd. / (parking) (41.71340, -71.48070) |
Roundabout Existing |
All-Way Yield Unknown |
1 Approaches 3 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2017 | |
|
Providence,
RI Providence Co. United States |
F C Greene Memorial Blvd. / Montgomery Ave. / Cladrashes Ave. (41.78572, -71.40615) |
Rotary Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2019 | No splitter islands on two legs. Pedestrian feature in central island. |
|
Cranston,
RI Providence Co. United States |
Rte 5 (Atwood Ave. / Oaklawn Ave.) / Cranston St. / Brooks St. (41.77694, -71.46888) |
Rotary Existing |
Other Unknown |
5 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
Mix of stop and yield control on entry. | |
|
Providence,
RI Providence Co. United States |
College Rd. / 1st Ave. (41.84136, -71.45992) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 15.8496 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2013 | |
|
Uxbridge,
MA Worcester Co. United States |
Rte 16 (Douglas St.) / Rte 146 WB Ramps (42.06785, -71.66491) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | |
|
(unincorporated),
GA Paulding Co. United States |
Burnt Hickory Rd. / Brownsville Extension / Stout Pkwy. (33.81564, -84.72399) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.facebook.com/PauldingCountyGovernment/videos/now-open-new-roundabout-at-brownsville-extension-were-excited-to-announce-the-of/1068624591512892/ |
|
(unincorporated),
GA Fulton Co. United States |
Butner Rd. / Union Rd. SW (33.65398, -84.56499) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2025 | Skewed intersection. Yield-controlled right-turn bypass lanes on north and south legs. https://www.11alive.com/video/traffic/44-million-south-fulton-roundabout-completed-expected-to-improve-safety/85-833bf58b-1d32-45b0-a4b1-bc7efefdefea |
|
Byron,
GA Peach Co. United States |
W White Rd. / Peavy Rd. / James E Williams Dr. (32.64050, -83.74012) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.facebook.com/100064752276448/posts/the-new-white-rd-roundabout-is-officially-open-were-thrilled-to-announce-the-com/1135966378571761/ |
|
Vestavia Hills,
AL Jefferson Co. United States |
Blue Lake Dr. / Sicard Hollow Rd. / Cahaba Heights Rd. (33.45106, -86.71773) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://vestaviavoice.com/news/roundabout-opens-at-blue-lake-drive-sicard-hollow-road/ |
|
Evans,
GA Columbia Co. United States |
Riverwood Pkwy. / General Wood Pkwy. / Mansford Ln. (33.58517, -82.18817) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2025 | https://www.wjbf.com/news/new-mini-roundabout-on-riverwood-parkway-causing-headaches-for-greenbrier-parents-in-car-line/ |
|
Myrtle Beach,
SC Horry Co. United States |
Fred Nash Blvd. / Agnes Ln. / Walton Dr. (33.68297, -78.95640) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2016 | |
|
Saugus,
MA Essex Co. United States |
Lincoln Ave. / Essex St. / Jackson St. (42.44848, -71.00986) |
Rotary Existing |
All-Way Yield Unknown |
4 Approaches 1 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
Parking along circulatory roadway. | |
|
Woburn,
MA Middlesex Co. United States |
Main St. / Common St. / Winn St. / Pleasant St. (42.47953, -71.15234) |
Other Existing |
Signal Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (3+ Lane) |
Triangular shaped. City common in center island with crosswalks leading to it and walking paths within central island. | |
|
Sevierville,
TN Sevier Co. United States |
Gateway Blvd. / Buc-ee's Blvd. (south) (35.97883, -83.60389) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2023 | |
|
Sevierville,
TN Sevier Co. United States |
Gateway Blvd / Buc-ee's Blvd. (north) (35.98354, -83.60111) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Year Completed estimated (2021-2024). |
|
Liberty Twp,
OH Butler Co. United States |
Millikin Rd. / Lesourdsville West Chester Rd. (39.40278, -84.43386) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2025 | |
|
Greenville,
NC Pitt Co. United States |
W 5th St. / Elizabeth St. / Albemarle Ave. (35.61205, -77.38004) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | No splitter islands. https://www.facebook.com/CityofGreenvilleNC/posts/construction-of-the-new-traffic-circle-on-west-5th-street-was-recently-completed/1108423424654367/. |
|
Zebulon,
NC Wake Co. United States |
SR 97 (W Gannon Ave.) / Pony Rd. / Wedgewood Ave. (35.82031, -78.32735) |
Unknown Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.youtube.com/watch?v=EDDiDL3ites. |
|
(unincorporated),
TX Fort Bend Co. United States |
Sienna Lakes St. / Owen Bend Dr. (29.48340, -95.49298) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Other (At-Grade) Single-Lane |
2025 | |
|
(unincorporated),
TX Fort Bend Co. United States |
Sienna Pkwy. / Sienna Lakes St. (29.47660, -95.49305) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 54.8637 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | |
|
Johns Island,
SC Charleston Co. United States |
Fenwick Hall Alley / Bernice Robinson Way (32.74886, -80.03425) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | Aerial image obscured by trees. Year Completed estimated (2023-2024). |
|
(unincorporated),
SC Anderson Co. United States |
SC 331 (Old Williamston Rd.) / Bowlan Rd. (34.58401, -82.55251) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2025 | https://www.linkedin.com/posts/sc-department-of-transportation_scdot-is-nearing-the-completion-of-the-activity-7363932840146739201-Ps4o. |
|
Selma,
NC Johnston Co. United States |
US 70 Alternate / W Providence Blvd. / Absher Rd. (35.51780, -78.28264) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
2024 | Add-lane right-turn bypass lane on west and south legs. |
|
Selma,
NC Johnston Co. United States |
W Providence Blvd. / Absher Rd. (35.52057, -78.28225) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2024 | Year Completed estimated (2023-2024). |
|
West Columbia,
SC Lexington Co. United States |
Ephrata Dr. / Pine Lake Dr. (34.01358, -81.12198) |
Traffic Calming Circle Existing |
All-Way Yield None |
4 Approaches 0 Driveways 20.7264 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2011-2012) |
|
West Columbia,
SC Lexington Co. United States |
Ephrata Dr. / Beaver Ln. (34.01298, -81.12465) |
Traffic Calming Circle Existing |
All-Way Yield None |
3 Approaches 0 Driveways 18.8976 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2011-2012) |
|
Elgin,
SC Richland Co. United States |
Jacobs Millpond Rd. / Deer Park Dr. (34.12117, -80.81637) |
Other Existing |
Other None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2008 | Year Completed estimated (2007-2009). South leg added with construction of roundabout. Mix of yield and uncontrolled entries. |
|
Middletown Township,
PA Bucks Co. United States |
Langhorne-Yardley Rd. / Bridgetown Pike (40.19483, -74.90581) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Single-Lane |
2025 | https://www.facebook.com/100064303254838/photos/1227933432693420/ |
|
Kearney,
NE Buffalo Co. United States |
US 30 (W 24th St.) / University Dr. (40.69946, -99.10935) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | Entrance to University of Nebraska Kearney campus. https://ruralradio.com/maxcountry/news/traffic-shifts-back-to-hwy-30-as-new-roundabout-opens-near-unk/ |
|
Bradenton,
FL Manatee Co. United States |
Old Farm Rd. / Honore Ave. (27.41838, -82.48035) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2025 | https://old-farm-rd-and-honore-ave-roundabout-manateegis.hub.arcgis.com/ |
|
Fort Worth,
TX Tarrant Co. United States |
W.J. Boaz Rd. / Bowman Roberts Rd. (32.87005, -97.41735) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 29.2608 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2021 | |
|
Keller,
TX Tarrant Co. United States |
Bear Creek Pkwy. / S Elm St. / Whitley Rd. (32.92708, -97.25184) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 35.0520 |
Other (At-Grade) Single-Lane |
2022 | |
|
Airway Heights,
WA Spokane Co. United States |
US 2 (W Sunset Hwy.) / S Lyons Rd. (47.64293, -117.57159) |
Roundabout Existing |
All-Way Yield Rectangular Rapid Flashing Beacon (RRFB) |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | |
|
Airway Heights,
WA Spokane Co. United States |
W 6th Ave. / S Lundstrom St. (47.64994, -117.59309) |
Roundabout Unknown |
All-Way Yield None |
3 Approaches 0 Driveways 23.7744 |
Other (At-Grade) Unknown |
2025 | |
|
Airway Heights,
WA Spokane Co. United States |
W 6th Ave. / S Lawson St. (47.64995, -117.58780) |
Roundabout Unknown |
All-Way Yield None |
4 Approaches 0 Driveways 23.7744 |
Other (At-Grade) Unknown |
2025 | |
|
Goshen,
IN Elkhart Co. United States |
Peddlers Village Rd. / Reliance Rd. (41.60870, -85.88765) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | Intersection shifted to west 100 ft. https://www.facebook.com/photo/?fbid=1196760372498683&set=a.233900875451309. |
|
Columbus,
IN Bartholomew Co. United States |
Rosemont Dr. / CR 200 W (39.23964, -85.95025) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2022 | Year Completed estimated (2019-2022). |
|
Columbus,
IN Bartholomew Co. United States |
W Lowell Rd. / CR 200 W (39.24456, -85.95057) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2024 | https://www.therepublic.com/2025/11/28/city-marks-official-completion-of-lowell-road-project/ |
|
Indian Trail,
NC Union Co. United States |
Lawyers R.d W / Indian Trail-Fairview Rd. (35.11025, -80.56789) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | Skewed intersection. |
|
Indian Trail,
NC Union Co. United States |
Lawyers Rd. / Rocky River Rd. N / Goose Creek Farm Ln. (35.11525, -80.58584) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | Rocky River Rd realigned about 300 feet SE. |
|
Mocksville,
NC Davie Co. United States |
US 158 / Farmington Rd. (35.95224, -80.52935) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Single-Lane |
2024 | https://www.daviecountync.gov/CivicAlerts.aspx?AID=1468&ARC=2156 |
|
Farmington,
NC Davie Co. United States |
Farmington Rd. / I-40 WB Ramps (35.95766, -80.53279) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 42.6720 |
Freeway Ramps (Grade-Separated) Single-Lane |
2023 | https://www.ncdot.gov/news/press-releases/Pages/2023/2023-08-02-davie-county-roundabout.aspx |
|
Chaska,
MN Carver Co. United States |
Engler Blvd. (CR 10) / Skyview Dr. / Park Ridge Dr. (44.80520, -93.59677) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | Turbo roundabout. Depressed lane dividers. |
|
Yucaipa,
CA San Bernardino Co. United States |
County Line Rd. / 5th St. (34.00464, -117.05629) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 45.7200 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2024 | Elliptical shaped. ICD = 150 ft x 145 ft. |
|
Calimesa,
CA San Bernardino Co. United States |
County Line Rd. / 3rd St. (34.00430, -117.04755) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2024 | On border of Yucaipa and Calimesa. https://www.facebook.com/people/County-Line-Road-Project/100083169738962/. |
|
Calimesa,
CA Riverside Co. United States |
County Line Rd. / 2nd St. (34.00449, -117.04319) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2024 | On border between Yucaipa and Calimesa. |
|
Yucaipa,
CA Riverside Co. United States |
County Line Rd. / California St. (34.00468, -117.03887) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2024 | On border of Yucaipa and Calimesa. |
|
Yucaipa,
CA San Bernardino Co. United States |
County Line Rd. / Bryant St. (34.00488, -117.03448) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 32.0040 |
Other (At-Grade) Single-Lane |
2024 | On border of Yucaipa and Calimesa. |
|
Salamanca,
NY Cattaraugus Co. United States |
SR 417 (Broad St.) / Iroquois Dr. / Messenger St. (42.15851, -78.73651) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 38.1000 |
Other (At-Grade) Single-Lane |
2025 | https://www.oleantimesherald.com/2025/08/21/salamanca-roundabout-project-nearing-completion/. |
|
Columbia,
TN Maury Co. United States |
S Main St. / W 8th St. / E 8th St. (35.61349, -87.03407) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 25.9080 |
Other (At-Grade) Single-Lane |
2025 | A statue of Thurgood Marshall has been erected in the central island. https://www.facebook.com/CityofColumbiaTN/videos/see-you-around-the-roundaboutthe-city-of-columbia-has-completed-construction-of-/2967828143398999/. https://www.facebook.com/margaret.ziegler/videos/a-new-statue-honoring-thurgood-marshall-now-stands-proudly-in-columbia-tn-unveil/1191676799450304/. |
|
Pocatello,
ID Bannock Co. United States |
E Briscoe Rd. / Park Lawn Dr. / Industry Way (42.93238, -112.46389) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2025 | Year Completed estimated (2024-2025). |
|
Charlestown,
IN Clark Co. United States |
CR 403 / Stacy Rd. (38.42635, -85.71956) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2025 | |
|
Moseley,
VA Chesterfield Co. United States |
Otterdale Rd. / Westerleigh Pkwy. (37.43012, -77.71944) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2025 | https://www.chesterfield.gov/CivicAlerts.aspx?AID=4409. |
|
Sorrento,
LA St. James Par. United States |
LA 70 / LA 3125 (30.10762, -90.87373) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | |
|
Stockbridge,
GA Rockdale Co. United States |
GA 138 / E Fairview Rd. SW (33.59985, -84.10113) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 70.1040 |
Other (At-Grade) Single-Lane |
2024 | Skewed intersection. Elliptical shaped. ICD = 230 ft x 160 ft. https://www.publicnow.com/view/E6A0C0498F448062D77B233DFDD694746AA49CEC?1719261995 |
|
Oxford,
MS Lafayette Co. United States |
Molly Barr Rd. / Chickasaw Rd. / Main St. (The Lamar) (34.38586, -89.51079) |
Roundabout Existing |
All-Way Yield None |
5 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2023 | Yield-controlled right-turn bypass lane on southeast leg. https://www.oxfordms.net/documents/misc/NewRoundabout2023.pdf. |
|
Montrose,
CO Montrose Co. United States |
E Oak Grove Rd. / Woodgate Rd. (38.45996, -107.86403) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 41.1480 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | Left-turn-only lane on east leg. Yield-controlled right-turn bypass lane on south leg. https://www.facebook.com/cityofmontroseco/posts/new-roundabout-at-woodgate-and-east-oak-grove-is-open-the-city-of-montrose-is-pl/1237823605053788/ |
|
Jackson,
GA Butts Co. United States |
US 23-GA 16 (W 3rd St.) / US 23 (Brookwood Ave.) / GA 16 (W 3rd St.) (33.29422, -83.97431) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2025 | https://www.dot.ga.gov/applications/geopi/Pages/Dashboard.aspx?ProjectID=0015425. |
|
Houston,
TX Harris Co. United States |
Navigation Blvd. / Jensen Dr. / Runnels St. (29.75927, -95.34579) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 48.7680 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2024 | Double-left-turn movement on southeast leg. |
|
Hill City,
MN Aitkin Co. United States |
US 169 / STH 200 (46.98658, -93.60475) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2025 | https://www.dot.state.mn.us/news/2025/05/27-d1-hwy200.html |
|
Gonzales,
LA Ascension Par. United States |
Church Point Rd. / Roddy Rd. (30.24006, -90.90380) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2024 | |
|
Gardnerville,
NV Douglas Co. United States |
Toler Ln. / Muller Pkwy. / Decker Rd. (38.93953, -119.72862) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2025 | https://www.douglascountynv.gov/news/what_s_new/toler_lane_roundabout_construction. |
|
Gardnerville,
NV Douglas Co. United States |
Buckeye Rd. / Muller Pkwy. (38.96130, -119.73837) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | https://www.recordcourier.com/news/2025/jul/09/muller-lane-parkway-work-will-close-buckeye-road-next-week/. |
|
Covington,
GA Newton Co. United States |
Brown Bridge Rd. / Magnet Rd. (33.55415, -84.00785) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 47.2440 |
Other (At-Grade) Single-Lane |
2024 | Elliptical shaped. ICD = 155 ft x 145 ft. https://www.facebook.com/GDOTEast/videos/crews-are-preparing-to-detour-magnet-road-at-brown-bridge-road-in-newton-countya/1573496266567977/ |
|
Braselton,
GA Jackson Co. United States |
GA 53 / New Cut Rd. / Ednaville Rd. (34.13223, -83.76743) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 0 Driveways 50.2920 |
Other (At-Grade) Single-Lane |
2024 | Elliptical shaped. ICD = 165 ft x 135 ft. https://www.facebook.com/Braselton411/posts/the-roundabout-at-hwy-53-new-cut-roadednaville-road-has-been-operational-for-jus/853349783584952/. |
|
Henderson,
NV Clark Co. United States |
E Paradise Hills Dr. / Greenway Rd. (35.99086, -114.97674) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 36.5760 |
Other (At-Grade) Single-Lane |
2021 | Year Completed estimated (2021-2022). |
|
Henderson,
NV Clark Co. United States |
Greenway Rd. / Heather Dr. (36.00537, -114.97668) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 27.4320 |
Other (At-Grade) Single-Lane |
2021 | Yield-controlled right-turn bypass lane on south leg. Year Completed estimated (2021-2022). |
|
Henderson,
NV Clark Co. United States |
Greenway Rd. / E Middleton Dr. / Onyx Mountain Dr. (36.01882, -114.97610) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2021 | Year Completed estimated (2021-2022). |
|
Henderson,
NV Clark Co. United States |
Paradise Hills Dr. / Nevada State Dr. (35.98365, -114.93505) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2021 | Year Completed estimated (2021-2022). |
|
Coal Grove,
OH Lawrence Co. United States |
SR 243 (Marion Pike) / US 52 WB Ramps (38.50099, -82.64949) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2025 | Raindrop shaped. https://irontontribune.com/2024/12/26/coal-grove-ramps-open-again-project-to-resume-in-spring/ |
|
Coal Grove,
OH Lawrence Co. United States |
SR 243 (Marion Pike) / US 52 EB Ramps (38.50022, -82.65130) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Freeway Ramps (Grade-Separated) Single-Lane |
2025 | https://irontontribune.com/2024/12/26/coal-grove-ramps-open-again-project-to-resume-in-spring/. |
|
(unincorporated),
NC Rowan Co. United States |
Old Salisbury-Concord Rd. / Irish Potato Rd. (35.50306, -80.54390) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
2024 | On border between Cabarrus County and Rowan County. https://www.kannapolisnc.gov/news/ID/30/Cabarrus-County-Roundabout-Construction-Starts-Next-Week. |
|
Toms River,
NJ Ocean Co. United States |
W College Dr. / N College Dr. (40.00760, -74.17067) |
Rotary Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 88.3920 |
Other (At-Grade) Single-Lane |
Elliptical shaped. ICD = 290 ft x 250 ft. | |
|
Brick,
NJ Ocean Co. United States |
Acapulco Dr. / W Briarcliff Dr. / E Briarcliff Dr. (40.04476, -74.09687) |
Other Existing |
Uncontrolled Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
Trenton,
NJ Mercer Co. United States |
Newtown Blvd. / Lake Dr. (40.22339, -74.62862) |
Other Existing |
One-Way/Two-Way Stop Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
||
|
Westampton,
NJ Burlington Co. United States |
Irick Rd. / (unknown) (40.03028, -74.82283) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2025 | |
|
Cinnaminson,
NJ Burlington Co. United States |
Harbor Blvd. / Camelot Ct. (40.01780, -75.00059) |
Unknown Existing |
Unknown Unknown |
3 Approaches 0 Driveways 39.9998 |
Other (At-Grade) Single-Lane |
||
|
Cinnaminson,
NJ Burlington Co. United States |
Harbor Blvd. / Nathan Dr. (40.01933, -75.00208) |
Unknown Existing |
Unknown Unknown |
4 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
||
|
Palmyra,
NJ Burlington Co. United States |
Harbour Dr. / Riverfront Dr. / Lakeside Dr. (40.00910, -75.03418) |
Other Existing |
Unknown Unknown |
4 Approaches 0 Driveways 70.1040 |
Other (At-Grade) Single-Lane |
||
|
Moorestown,
NJ Burlington Co. United States |
Laurel Creek Blvd. / Oakmont Dr. (39.99317, -74.90294) |
Other Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
Moorestown,
NJ Burlington Co. United States |
Hazeltime Circle: Sarazen Dr. / Tournament Dr. (39.98666, -74.89670) |
Other Existing |
Unknown Unknown |
3 Approaches 10 Driveways 70.1040 |
Other (At-Grade) Single-Lane |
Pedestrian access to central island. No splitter islands. | |
|
Moorestown,
NJ Burlington Co. United States |
Laurel Creek Blvd. / Troon Ct. (39.99753, -74.89022) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
Delanco,
NJ Burlington Co. United States |
Newtons Landing Blvd. / Russ Farm Way / Pennington Ct. (40.04379, -74.94370) |
Other Existing |
Unknown Unknown |
3 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Single-Lane |
No splitter islands on two legs. | |
|
Bridgeboro,
NJ Burlington Co. United States |
Russ Farm Way / Shipps Way (40.04530, -74.94627) |
Other Existing |
Unknown Unknown |
2 Approaches 0 Driveways 47.9999 |
Other (At-Grade) Single-Lane |
No splitter islands. | |
|
Sicklerville,
NJ Camden Co. United States |
Jefferson Dr. / Wilson Dr. (39.78690, -75.04044) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 30.4800 |
Other (At-Grade) Single-Lane |
2011 | Year Completed estimated (2010-2011). |
|
Rochester,
MN Olmsted Co. United States |
1st Ave. SE / 6th St. SE (44.01687, -92.46105) |
Roundabout Existing |
All-Way Yield None |
4 Approaches 1 Driveways 32.0037 |
Other (At-Grade) Single-lane w/ Traversable Central Island |
2025 | Compact roundabout serves as the turnaround for the bus rapid transit route, with one-way eastbound and westbound grade separated cycle tracks on the north and south legs. |
|
Charleston,
SC Berkeley Co. United States |
Island Park Dr. / Fairbanks Dr. (32.86747, -79.90146) |
Roundabout Existing |
All-Way Yield None |
3 Approaches 0 Driveways 39.6240 |
Other (At-Grade) Single-Lane |
2004 | Year Completed estimated (2002-2005). |
|
Charleston,
SC Berkeley Co. United States |
Island Park Dr. / Robert Daniel Dr. (32.86967, -79.90304) |
Other Existing |
All-Way Yield None |
4 Approaches 0 Driveways 60.9600 |
Other (At-Grade) Single-Lane |
1999 | Yield signs placed in central island; no signs on right side of entry. Elliptical shaped. ICD = 200 ft x 165 ft. Year Completed estimated (1996-2002). |
|
Charleston,
SC Berkeley Co. United States |
Island Park Dr. / Ithecaw Creek St. (32.88205, -79.89531) |
Other Existing |
All-Way Yield None |
3 Approaches 0 Driveways 33.5277 |
Other (At-Grade) Single-Lane |
2007 | No splitter islands on 2 legs. |
|
Auburn,
CA Placer Co. United States |
SR 49 (Grass Valley Hwy.) / Florence Ln. / Lorenson Rd. (38.97820, -121.10831) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | https://www.facebook.com/CaltransDistrict3/videos/state-route-49-has-a-new-roundabout-at-florence-lnlorenson-rd-be-mindful-of-the-/1272931464323547/ |
|
Auburn,
CA Placer Co. United States |
SR 49 (Grass Valley Hwy.) / Lone Star Rd. (38.99650, -121.10907) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 0.0000 |
Other (At-Grade) Multilane (2 Lane, 2x1 max) |
2025 | |
|
Mendota,
CA Fresno Co. United States |
SR 33 (Derrick St.) / SR 180 (Oller St.) (36.76037, -120.38644) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 42.6720 |
Other (At-Grade) Single-Lane |
2025 | Northeast leg stubbed. |
|
Mobile,
AL Mobile Co. United States |
McGregor Ave. S / Dauphin St. / Wimbledon Dr. (30.68570, -88.14859) |
Roundabout Existing |
All-Way Yield Unknown |
4 Approaches 0 Driveways 54.8640 |
Other (At-Grade) Multilane (2 Lane, 2x2 max) |
2025 | Elliptical shaped. ICD = 180 ft x 140 ft. https://www.youtube.com/watch?v=3vxsxPC0wOM |
|
Seattle,
WA King Co. United States |
SR 523 (NE 145th St.) / I-5 SB Ramps (47.73411, -122.32590) |
Roundabout Existing |
All-Way Yield Unknown |
3 Approaches 0 Driveways 41.1480 |
Freeway Ramps (Grade-Separated) Multilane (2 Lane, 2x1 max) |
2025 | Yield-controlled right-turn bypass lane on north leg. On the border between Shoreline and Seattle. https://engage.shorelinewa.gov/145corridor |